Owner Guidance
Approved Alternate Materials and Methods
- Schindler Miconic TX - Approval Letter
- ThyssenKrupp Endura Traction MRL Approval Letter
- ThyssenKrupp Endura Traction MRL Inspector Guide
- ThyssenKrupp Endura Traction MRL Maintenance Control Program
- ThyssenKrupp Endura Hydraulic MRL Approval Letter
- Schindler 3300 MRL Approval Letter
- Otis GEN2 Overspeed Governor with Electronic Speed Reducing Switch Approval Letter
- TK Elevator Endura Hydraulic MRL- REPPS Approval Letter
- TK Elevator Endura Hydraulic MRL- REPPS Inspector's Guide
Inspector Guidance
- ThyssenKrupp MRL Inspector Guide
- ThyssenKrupp TAC32T Inspector Guide
- Otis Interactive Voice Response Inspector Guide
- Requirements for Sprinklers and Initiating Devices
- Conveyance Inspection Guidance
- Audit Guidance
- Smoke Doors and Smoke Curtains at Elevator Entrances
Licensing
Policies
- Shut Down of Dangerous Conveyances - policy for inspectors and mechanics
- Single-Bottom Hydraulic Cylinder Mitigation - policy with requirements for hydraulic elevators with single-bottom cylinders
- Colorado Conveyance Emergency Power - policy for elevators provided with Emergency Power Operation